职位详情
项目协调(项目经理)
1.3-1.6万
格劳博机床(中国)有限公司
大连
5-10年
本科
11-27
工作地址

金州新区铁山东路105号

职位描述
Education教育程度:
• Bachelor or above in Mechanical or Electrical Engineering
机械或电气工程专业,本科或以上学历
Working experience工作经验:
• Three years CNC machine tools area working experience as well as knowledge in project coordination or management
三年以上CNC机床行业工作经验 并具有项目协调工作经验或项目管理知识
Skill and competency技能及任职能力:
• Fluent in speaking/writing English (German preferred)
良好的英语听说读写(会德语最好);
• Conflict Management skills
具备冲突管理能力;
• Good communication skills and team working spirit
良好的沟通能力及团队协作精神;
• Compromised with project on results (Time, Quality, Cost)
保证项目的时间,质量,成本等;
• Risk Management skills
具备风险管理能力;
• High skill in coordination and organization
优秀的协调组织能力;
• Strong ability in project planning, tracking and cost control.
擅长于项目规划,追踪及成本控制的能力;
• Profound MS-office knowledge
深厚的办公软件应用能力;
• Available for China and International travel, -follow the projects onsite during 30% of the calendar year;
能够在国内及国外出差- 在年度30% 左右的时间需要在项目现场跟踪项目。
This position requires but not limits following major job functions. Temporary duties consuming <10% of working time are not listed unless it is an essential job function.
本岗位职责包含但不限于以下列出的主要工作职责,占用工作时间小于10% 的临时职责没有列出,除非它是主要职责。
1. Specific staff demand/supply scheduling for the project site
项目现场具体工作人员的供需计划;
2. Preparation for setting up the construction site
施工现场具体设施的准备;
3. Detailed scheduling and planning for the site, till FAC/last outstanding payment
为施工现场创建详细的计划表, 直至项目终验收/持续至未付款项;
4. Monitoring progress and managing of the project and find solutions in case of deviations
监控并管理现场项目进度并解决发现的问题;
5. Responsibility for compliance with the goals for the construction site (time, quality, cost)
负责项目现场的目标的实施(时间、质量、成本);
6. Controlling and report of technical issues to the responsible departments and following till closing
控制和向相关部门报告技术问题并跟踪至关闭;
7. Coordination Onsite Leader (site manager) for installation, commissioning, project acceptance tasks and procedure
和现场工长协调现场安装,调试,项目验收事宜及进度;
8. Contacting with the customer (Alignments, Agreements, schedule adjustment, retoolings and so on)
与客户保持沟通, (事宜协商,计划调整,项目改造等);
9. Open issue list (creation, tracking, maintain till closing)
开口问题清单的创建跟踪以及维护,直至关闭;
10. Responsible for the processing of open issue list
负责开口问题清单的追踪;
11. Resource planning for the site (forecasting)
现场资源规划(前瞻性);
12. Handling other tasks assigned by the General Manager or the supervisor/manager
承办总经理或上级主管/经理安排的其他事宜。
13. Keep all data and information related to the project and technology accurate, secure, and properly stored, and protected from unauthorized access, modification, or loss.
对所有涉及项目、技术等相关资料文件数据信息进行准确、安全、有效的保存,防止未经授权的访问、修改或丢失。

以担保或任何理由索取财物,扣押证照,均涉嫌违法,请提高警惕

立即申请